Site Management Extensions

Product news
December 30, 2022

Site Management is a comprehensive platform for data exchange and site monitoring. It consolidates all the essential project data into a single view, minimizing disruptions and enhancing visibility. This enables effective mitigation of potential delays and unforeseen expenses, ensuring smoother progress and delivery.
Optimize your construction project with the Starterpack—an essential foundation that can be enhanced by a range of extensions and integrations, including Machine Control, Utilization, Productivity, PointScene, and GeoView.

Starterpack

Streamline your construction project with the Starterpack. Connect all stakeholders involved, by providing not only file management of the crucial data to be exchanged, but also the necessary easy-to-use tools.  The background maps provide a level of comprehensibility that is unmatched when it comes to positioning the designs or understanding an area for the first time.  Easily view and review models and drawings directly on the map, as Site Management supports various file formats, including LandXML, DWG, DGN, DXF, and IFC.  To increase  situational awareness, add publicly available WMS and WMTS maps or your own drone imagery from the site. 

Extension: Machine Control

Ensure seamless data delivery between designers and operators, fostering alignment and eliminating delays or rework.

Main benefits

  1. Time Savings. Accurate design data sent directly to machines reduces the chances of errors and discrepancies between the design intent and the executed work. This minimizes the need for rework, saving both time and materials. The precision achieved by sending accurate design data to machines allows for more accurate budgeting and cost estimation. This can help project managers avoid unexpected expenses and stay within budget constraints.
  2. Cost Savings. Accurate design data sent directly to machines reduces the chances of errors and discrepancies between the design intent and the executed work. This minimizes the need for rework, saving both time and materials. The precision achieved by sending accurate design data to machines allows for more accurate budgeting and cost estimation. This can help project managers avoid unexpected expenses and stay within budget constraints. 
  3. Increase efficiency. By eliminating manual data input and interpretation, machines can operate more efficiently and with higher precision. This efficiency reduces labor costs and enhances overall project productivity. Seamless integration of design data with on-site machines enhances collaboration among different stakeholders, such as architects, engineers, and construction teams. This collaboration can lead to better decision-making and more efficient problem-solving, ultimately reducing costs. 

Conclusion

Sending design data directly to machines on a construction site through advanced technologies can lead to significant cost savings by minimizing rework, optimizing material usage, improving efficiency, and streamlining construction processes. 

Extension: Productivity and Private Beta Program

Optimizing Construction Management: Enhancing Production, Productivity, Safety, and Sustainability in Construction Projects.

Main benefits

  1. Focus on Production. In order to achieve successful outcomes, it is crucial to prioritize efficient production processes in construction site management. We will delve into the details of production optimization and share practical strategies that can enhance productivity, minimize delays, and maximize profitability for your projects. 
  2. Ensure Safety. Safety is paramount in construction site management. Learn about the importance of maintaining a safe working environment and the best practices that can safeguard the well-being of workers and mitigate potential hazards. Discover how adopting a comprehensive safety approach can lead to higher productivity and overall project success.
  3. Address Sustainability. Embracing sustainable practices is no longer an option but a necessity in construction site management. Explore the significance of incorporating environmentally friendly measures into your projects, and gain insights into effective strategies for reducing the industry’s carbon footprint, enhancing energy efficiency, and promoting a greener and more sustainable future. 

Conclusion 

Throughout our exploration of construction site management, we have covered the key pillars of production, productivity, safety, and sustainability. By implementing the principles and strategies discussed, you can overcome challenges, achieve excellence in your projects, and contribute to the advancement of the construction industry. Ready to take your construction site management skills to the next level? 

Recap of key points discussed: 

  • Efficient production processes 
  • Promoting safety 
  • Implementing sustainability 

Contact us to learn more about our Private Beta Program

Extension: Utilization

Fleet Management: Control your operations’ activity and consumption to effectively manage costs and prevent unforeseen machine downtime during construction projects.

Main benefits

  1. Resource Allocation. Monitoring machine activities allows project managers to optimize resource allocation. Centralize data from all your equipment, no matter the make, model, or year.  By knowing which machines are in use, they can assign tasks more efficiently and ensure that equipment is utilized to its full capacity.  
  2. Cost Control. Monitoring machine usage assists in controlling project costs. It allows project managers to identify any inefficiencies, reduce idle time, and make informed decisions to minimize unnecessary expenses related to equipment operation and maintenance.
  3. CO2 Reporting. Construction sites often have environmental considerations. Tracking machine activities can help assess and minimize the environmental impact by optimizing fuel consumption, reducing emissions, and managing waste efficiently.  Receive reports and alerts on downtime, faults, fuel use, carbon impact, and more.

Conclusion 

In summary, tracking the activities of machines on a construction site is essential for efficient project management, cost control, safety compliance, and overall success in delivering a construction project on time and within budget. 

Recap of key points discussed: 

  • Resource allocation 
  • Cost control 
  • CO2 reporting 

___________________________

Why wait to revolutionize your construction projects? Embrace Site Management – the ultimate solution for streamlined project excellence. Consolidate, collaborate, and elevate efficiency with our Starterpack and powerful extensions.

Contact us now to transform your construction management and pave the way for success!

Let’s talk

about ways to simplify your workflows.

Related blog posts

All posts
Copyright © 2013-2024 AGA CAD, UAB. All rights reserved | Privacy policy