New Metal Framing Floor+ version 2016.7 together with 2017 are released!
- Now there is a new possibility to place Brace Group automatically between two studs with predefined rules:
- Brace Groups can be added, modified, or deleted if needed:
- Added a possibility to Update Details by Wall Link and Delete Details from the frame.
- Secondary Bridging/Nogging/Blocking is renamed to Secondary Joist System and a new tab was added – Special Secondary Joist System.
AGACAD TOOLS4BIM Dock is a really easy way to get new Metal Framing Floor+ version:
- If you are already Metal Framing Floor+ user, you should see a special icon (red bubble) in TOOLS4BIM Dock window that appears near the product and notifies that this application requires updating;
- If you want to try this BIM solution for Revit®, it is easy to do, just CLICK HERE to download a trial of this software.